Mon–Fri: 08:00–16:00 ISO 9001:2015 Compliant

An Interactive Blueprint

Walk Through a Working Almin Quarry

Seven stops. One working section — from the workshop gate to the no-blast zone. Scroll to travel the bench, open each station to see how we work, and yes: you get to fire the blast.

Scroll to begin the tour
Engineering line drawing of a working opencast quarry A cross-section of a quarry with seven stations: head office and workshop, survey and blast planning, production drilling, charging and blasting, ground consolidation, seismograph monitoring beside a village, and chemical rock breaking near structures. CH 0+400 CH 1+600 CH 2+800 CH 4+000 CH 5+200 BENCH 1 · EL. 1015 BENCH 2 · EL. 1090 PIT FLOOR · EL. 1160 HAUL RAMP 1:10 ALMIN PROJECTS ON-SITE MAINTENANCE WORKSHOP · EST. 2014 PREVENTATIVE SCHEDULES BLASTCALC PRO SURVEY · PATTERN DESIGN · COSTING S 4.0 m 12.0 m Ø 140 mm JUNJIN JD1400E EXCLUSION ZONE ELECTRONIC INITIATION · FULL HARNESS CHECK SOIL NAILS @ 2.0 m GRID · SHOTCRETE 75 mm · PRESSURE GROUTING GROUND VIBRATION · AIR BLAST · PPV mm/s PROTECTING THE NEIGHBOURS — WITH DATA ZERO VIBRATION · NO FLYROCK 1 OFFICE & WORKSHOP 2 SURVEY & PLANNING 3 PRODUCTION DRILLING 4 CHARGING & BLASTING 5 GROUND CONSOLIDATION 6 SEISMOGRAPH STATION 7 CHEMICAL BREAKING
Stop 1 of 7 Head Office & Workshop
Blast recorded at Stop 6 PPV 4.2 mm/s · Air blast 118 dB — comfortably within limits. That's the data we hand your neighbours.

The Tour, Stop by Stop

The full interactive tour runs on larger screens — here's the same journey in seven stops.

Stop 1

Head Office & Workshop

Procurement, logistics and administration run from Rustenburg — alongside our own maintenance workshop that keeps the Junjin fleet on preventative schedules.

About Almin Projects
Stop 2

Survey & Blast Planning

Survey data feeds BlastCalc Pro, our in-house platform, where every pattern is simulated and costed — and every estimate price-gated — before work begins.

See BlastCalc Pro
Stop 3

Production Drilling

Junjin JD1400E rigs drill the pattern to plan — up to 140 mm diameter — for fragmentation you can load, haul and crush efficiently.

Opencast Drilling & Blasting
Stop 4

Charging & Controlled Blasting

Charged under strict protocols, cleared exclusion zones and electronic initiation — controlled energy exactly where the design put it.

Civil Drilling & Blasting
Stop 5

Ground Consolidation & Grouting

Pressure grouting, soil nails and shotcrete stabilise slopes, high walls and foundations — the complete toolkit from one contractor.

Ground Consolidation
Stop 6

Seismograph Monitoring

Calibrated seismographs measure ground vibration and air blast at the nearest receptors, turning every blast into a defensible compliance report.

Seismograph Monitoring
Stop 7

Chemical Rock Breaking

Where explosives can't go, expansive agents split rock silently — zero vibration, no flyrock, safe beside structures and utilities.

Chemical Rock Breaking

That's how we work. Now let's talk about your rock.

From the first survey peg to the final compliance report — Almin Projects runs the whole journey you just toured. Tell us about your site and we'll bring the plan.